Japan · Boiling water reactor

Higashi Dori.

3 ABWR units at Higashi Dori, beside the ABWR plant concept. The 3D model shows how the ABWR design works; it is not Higashi Dori's actual layout.

Back to the globe at Higashi Dori
Close view of the illustrative ABWR concept: a tall boiling water reactor vessel opened to show its core, separators and dryer, with ten internal recirculation pumps in the bottom head, a forest of fine-motion control rod drives below it, and four main-steam lines with isolation valves.DESIGN CONCEPT · NOT A SIMULATION

Reference still · interactive view loads when available

Named design · ABWR

The ABWR plant concept.

The ABWR design’s concept, not Higashi Dori. The model shows how an ABWR plant works, drawn from the design’s public description, in the generic layout every design in the plant library shares: the reactor island, a turbine hall, air-cooled condensers and a grid connection. It does not show Higashi Dori's buildings, number of units, cooling or equipment.

The concept follows the generic ABWR described to the IAEA, rated at 3,926 MWt and 1,350 MWe net. Built units differ: Kashiwazaki-Kariwa 6 and 7 are rated 1,315 MWe net, Hamaoka 5 1,325 MWe and Shika 2 1,304 MWe; Hamaoka 5 introduced a sealless fine-motion drive, and the UK version powers all its internal pumps through motor-generator sets. The vessel is drawn at 0.5 scale in the plant library’s shared building frame, and the reinforced concrete containment and its suppression pool are left out.

A large boiling water reactor of about 1,350 MWe. Water boils in an 872-bundle core, and separators and a dryer above it send dry steam straight from the vessel to the turbine, with no steam generator. Ten pumps built into the bottom of the vessel drive the water round in place of the external recirculation loops of earlier boiling water reactors, and 205 fine-motion control rod drives enter from below. A reinforced concrete containment with a suppression pool surrounds the vessel.

Fuel
Uranium dioxide
Reaction
Splitting heavy nuclei
Energy transfer
Direct cycle with internal recirculation pumps

The vessel envelope and the counts of bundles, internal pumps, control rod drives, main-steam lines and feedwater nozzles follow the IAEA status report and the UK regulator’s fault studies report. The island is drawn at 0.5 scale; the head shapes, internal elevations, core height, separator and dryer counts, pump and drive sizes, the pedestal and all routing are illustrative, and the containment and its suppression pool are not drawn.

Concept source: IAEA ARIS · Status report: ABWR. Procedural geometry drawn for teaching: source anchors are identified in the component records; other dimensions and placement are illustrative. No physics results are computed.

Units the source data files as ABWR open this concept. Other BWR units open the family’s boiling water reactor reference concept.

Spotter’s guide · BWR

Boiling water reactor

Water boils inside the reactor vessel and the steam goes straight to the turbine. One loop, no steam generators.

ABWR · ESBWR · BWRX-300

Inside the reactor · ABWR

The ABWR by its published numbers.

Each figure is the design’s own, as its source publishes it, with the page it is on. They describe the design, not any station: built units may be uprated, and the station’s own capacities are in its unit table. Nothing here is computed.

872 fuel bundles on a square lattice (IAEA ARIS status report, Table 2, p. 7; §5.2, p. 14). Drawn to the published count and packed to a circle: the real core outline steps differently at its edge, and no loading pattern, fuel batch or control position is shown.
Power
Thermal power3,926 MWtIAEA ARIS status report, Table 2, Fuel/Core, p. 7; §5.2, p. 14
Gross electric outputapproximately 1,420 MWeIAEA ARIS status report, §5.5 Secondary side, p. 17
Net electric output (design)1,350 MWeIAEA ARIS status report, Table 2, capacity to electric grid, p. 5
Turbine speed (60 Hz design)1,800 rpmIAEA ARIS status report, §5.5 Secondary side, p. 17
Core
Fuel bundles872IAEA ARIS status report, Table 2, p. 7; §5.2, p. 14
Bundle lattice10 × 10, squareIAEA ARIS status report, Table 1, p. 5
Control rod drives205, fine-motion, from belowIAEA ARIS status report, §5.2, p. 14
Refuelling cycle12-24 monthsIAEA ARIS status report, Table 2, Fuel/Core, p. 7
Reactor coolant system
Coolant loops (NSSS layout)Direct cycleIAEA ARIS status report, Table 1, NSSS layout, p. 4
Recirculation pumps10, reactor internal pumps, variable speedIAEA ARIS status report, Table 1, p. 4; reactor recirculation system, p. 24
Reactor pressure7.07 MPaIAEA ARIS status report, Table 2, Plant Infrastructure, p. 6
Core inlet temperature278 °CIAEA ARIS status report, Table 2, p. 6
Core outlet temperature288 °CIAEA ARIS status report, Table 2, p. 6
Steam and feedwater
Steam pressure7.07 MPaIAEA ARIS status report, Table 2, Nuclear System, p. 9
Steam temperature288 °CIAEA ARIS status report, Table 2, Nuclear System, p. 9
Steam flow2,122 kg/sIAEA ARIS status report, Table 2, Nuclear System, p. 9
Feedwater temperature216 °CIAEA ARIS status report, Table 2, Nuclear System, p. 9; §5.5, p. 17
Vessel and containment
Reactor vessel diameter (inside or outside not stated)7,100 mmIAEA ARIS status report, Table 2, NSSS largest component diameter, p. 6
Reactor vessel length21,000 mmIAEA ARIS status report, Table 2, NSSS largest component length, p. 6
ContainmentPressure suppression; reinforced concrete containment vessel with a steel linerIAEA ARIS status report, Table 2, containment type, p. 6; §5.6, p. 19
Design life60 yearsIAEA ARIS status report, Table 2, Plant Infrastructure, p. 5

Sources: IAEA ARIS status report. Page numbers refer to the copies read on 2026-11-07; the IAEA builds its status reports when they are downloaded, so its pagination can shift.

From reactor to grid · ABWR

Where the ABWR’s heat goes.

One unit at its design rating, from the published figures above. Most of the reactor’s heat leaves through the condenser to the cooling water or air; the rest becomes electricity, some of which runs the plant itself. A figure marked “derived” is plain arithmetic on published ones; nothing is simulated.

Used in the plant
about 70 MWeDerived: about 1,420 MWe gross less 1,350 MWe net
Heat rejected through the condenser
about 2,506 MWtDerived: 3,926 MWt of reactor heat less about 1,420 MWe gross
Net efficiency
about 34.4 %Derived: 1,350 MWe net of 3,926 MWt
  1. 01 Heat source
    Core inlet to outlet
    278 → 288 °CIAEA ARIS status report, Table 2, p. 6
  2. 02 Steam
  3. 03 Turbine and generator
    Turbine speed (60 Hz design)
    1,800 rpmIAEA ARIS status report, §5.5 Secondary side, p. 17
  4. 04 Cooling and return
    Heat rejected
    about 2,506 MWtDerived
  5. 05 Grid connection
    Used in the plant
    about 70 MWeDerived
    Net efficiency
    about 34.4 %Derived

Higashi Dori’s 3 ABWR units at design rating

Together they would take 11,778 MWt of heat from their reactors and reject about 7,520 MWt to their cooling. Their own published net capacities add to 0 MWe, if all were running.

Derived: 3 units × 3,926 MWt; 3 units × about 2,506 MWt. Built units may be uprated or run below rating, so these are the design’s figures scaled by the unit count, not the station’s operating data.

The whole station · Higashi Dori

Higashi Dori as one power plant.

Every unit on the site, from the atlas’s unit records: each reactor drives its own generator, which feeds the station’s switchyard and the grid. This is a schematic of how the units connect, not the station’s layout; the atlas records no buildings, cooling, switchyard arrangement or grid voltage.

Higashi Dori-1 (Tohoku): BWR, suspended, 1,067 MWe net1BWRG1,067 MWeSuspendedHigashi Dori-1 (Tokyo): ABWR, planned, 3,926 MWt at design rating1ABWR3,926 MWtG—PlannedHigashi Dori-2 (Tohoku): ABWR, planned, 3,926 MWt at design rating2ABWR3,926 MWtG—PlannedHigashi Dori-2 (Tokyo): ABWR, planned, 3,926 MWt at design rating2ABWR3,926 MWtG—PlannedSwitchyardGridHigashi Dori-1 (Tohoku): BWR, suspended, 1,067 MWe netHigashi Dori-1BWR · 1,067 MWe · SuspendedGHigashi Dori-1 (Tokyo): ABWR, planned, 3,926 MWt at design ratingHigashi Dori-1ABWR · — · PlannedGHigashi Dori-2 (Tohoku): ABWR, planned, 3,926 MWt at design ratingHigashi Dori-2ABWR · — · PlannedGHigashi Dori-2 (Tokyo): ABWR, planned, 3,926 MWt at design ratingHigashi Dori-2ABWR · — · PlannedGGrid
  • Planned · 3
  • Suspended · 1
  • On this page
Operating
None
Being built or planned
3 units · 0 MWe net
Suspended
1 unit · 1,067 MWe net
Plant concepts here
ABWR (3) · BWR reference (1)