France · Pressurized water reactor

Flamanville.

1 EPR unit at Flamanville, beside the EPR plant concept. The 3D model shows how the EPR design works; it is not Flamanville's actual layout.

Back to the globe at Flamanville
Close view of the illustrative EPR concept: a four-loop pressurized water reactor with four tall U-tube steam generators, one opened to show its tubes and dryers, around a vessel with its core in view, coolant pumps, a pressurizer, a steam header overhead, and the core catcher’s spreading compartment beside the reactor pit.DESIGN CONCEPT · NOT A SIMULATION

Reference still · interactive view loads when available

Named design · EPR

The EPR plant concept.

The EPR design’s concept, not Flamanville. The model shows how an EPR plant works, drawn from the design’s public description, in the generic layout every design in the plant library shares: the reactor island, a turbine hall, air-cooled condensers and a grid connection. It does not show Flamanville's buildings, number of units, cooling or equipment.

The concept follows the standard EPR described to the IAEA, rated at 4,590 MWt and 1,650 MWe net and already revised with feedback from the Olkiluoto 3 and Flamanville 3 builds; the UK EPR assessed in Britain, based on Flamanville 3, was described at 1,600 to 1,660 MWe net, so units differ in rating and detail. The four loops are drawn at 0.45 scale in the plant library’s shared building frame, turned so the camera looks between two of them, and the double containment is left out to show the loops and the core catcher.

A large pressurized water reactor of about 1,650 MWe. Water at 15.5 MPa carries heat from a 241-assembly core through four loops, each with a vertical U-tube steam generator and a pump; an axial economizer in each generator sends the feedwater to the cold side of the tube bundle, which raises the steam pressure. If a core ever melted through the vessel, the melt would gather in the reactor pit, then flow through a melt plug into a spreading compartment beside it, where water from a tank inside the containment floods and cools it.

Fuel
Uranium dioxide or mixed-oxide assemblies
Reaction
Splitting heavy nuclei
Energy transfer
Four pressurized-water loops to steam generators

The loop count, the vessel envelope, the core size and lattice, the 89 control drives, the pressurizer volume and the core catcher’s arrangement follow the IAEA status report and the UK regulator’s reports. The whole reactor coolant system is drawn at 0.45 scale; steam generator, pump and pipe sizes, the plan layout, the pit and compartment sizes and all routing are illustrative, and the double containment and the reactor building are not drawn.

Concept source: IAEA ARIS · Status report: EPR. Procedural geometry drawn for teaching: source anchors are identified in the component records; other dimensions and placement are illustrative. No physics results are computed.

Units the source data files as EPR-1750 and EPR open this concept. Other PWR units open the family’s pressurized water reactor reference concept.

Spotter’s guide · PWR

Pressurized water reactor

Water held at around 155 bar stays liquid as it carries heat from the core to steam generators, where a second loop boils. The most common reactor on Earth.

VVER · AP1000 · EPR · APR-1400 · Hualong One

Inside the reactor · EPR

The EPR by its published numbers.

Each figure is the design’s own, as its source publishes it, with the page it is on. They describe the design, not any station: built units may be uprated, and the station’s own capacities are in its unit table. Nothing here is computed.

241 fuel assemblies on a square lattice (IAEA ARIS status report, Table 2, p. 11; §5.2, p. 23). Drawn to the published count and packed to a circle: the real core outline steps differently at its edge, and no loading pattern, fuel batch or control position is shown.
Power
Thermal power4,590 MWtIAEA ARIS status report, Table 2, Fuel/Core, p. 11
Gross electric output1,770 MWeIAEA ARIS status report, §1 Overview, p. 1
Net electric output1,650 MWeIAEA ARIS status report, §1 Overview, p. 1; Table 2, p. 10
Core
Fuel assemblies241IAEA ARIS status report, Table 2, p. 11; §5.2, p. 23
Assembly lattice17 × 17, squareIAEA ARIS status report, Table 1, p. 9; §5.2, p. 24
Fuel rods per assembly265 (with 24 guide tubes)IAEA ARIS status report, §5.2, p. 24
Active core height4.2 mIAEA ARIS status report, Table 2, Reactor Core, p. 14
Control assemblies89 rod cluster control assembliesIAEA ARIS status report, §5.2, p. 24
Enrichment4.95 %IAEA ARIS status report, Table 2, Fuel/Core, p. 11 (≤ 5.0 wt% U-235 in §5.2, p. 24)
Refuelling cycle24 monthsIAEA ARIS status report, Table 2, Fuel/Core, p. 11
Reactor coolant system
Coolant loops4IAEA ARIS status report, §5.1 Primary circuit, p. 18
Steam generators4, vertical U-tube with axial economizerIAEA ARIS status report, Table 2, p. 11 (U tubes with axial economizer); §5.1, p. 21 (vertical U-tube); p. 39 (the four steam generators)
Reactor coolant pumps4, vertical single-stage shaft-sealIAEA ARIS status report, Table 1, p. 8; §2.4.5, p. 22
Primary pressure15.5 MPaIAEA ARIS status report, Table 2, Plant Infrastructure, p. 10
Core inlet temperature295.2 °CIAEA ARIS status report, Table 2, p. 10
Core outlet temperature330 °CIAEA ARIS status report, Table 2, p. 10
Steam and feedwater
Steam pressure7.72 MPaIAEA ARIS status report, Table 2, Nuclear System, p. 13
Steam flow2,604 kg/sIAEA ARIS status report, Table 2, Nuclear System, p. 13
Feedwater temperature230 °CIAEA ARIS status report, Table 2, Nuclear System, p. 14
Vessel and containment
Reactor vessel diameter (inside or outside not stated)4,870 mmIAEA ARIS status report, Table 2, NSSS largest component diameter, p. 10
Reactor vessel length13,083 mmIAEA ARIS status report, Table 2, NSSS largest component length, p. 10
Reactor vessel wall250 mmIAEA ARIS status report, Table 2, NSSS largest component thickness, p. 11
ContainmentDouble: prestressed concrete inner wall with a steel liner, reinforced concrete outer wallIAEA ARIS status report, §4 Containment, p. 17
Design life60 yearsIAEA ARIS status report, Table 2, Plant Infrastructure, p. 9

Sources: IAEA ARIS status report. Page numbers refer to the copies read on 2026-11-07; the IAEA builds its status reports when they are downloaded, so its pagination can shift.

From reactor to grid · EPR

Where the EPR’s heat goes.

One unit at its design rating, from the published figures above. Most of the reactor’s heat leaves through the condenser to the cooling water or air; the rest becomes electricity, some of which runs the plant itself. A figure marked “derived” is plain arithmetic on published ones; nothing is simulated.

Used in the plant
120 MWeDerived: 1,770 MWe gross less 1,650 MWe net
Heat rejected through the condenser
2,820 MWtDerived: 4,590 MWt of reactor heat less 1,770 MWe gross
Net efficiency
about 35.9 %Derived: 1,650 MWe net of 4,590 MWt
  1. 01 Heat source
    Core inlet to outlet
    295.2 → 330 °CIAEA ARIS status report, Table 2, p. 10
  2. 02 Steam
  3. 03 Turbine and generator
  4. 04 Cooling and return
    Heat rejected
    2,820 MWtDerived
  5. 05 Grid connection
    Used in the plant
    120 MWeDerived
    Net efficiency
    about 35.9 %Derived

Flamanville’s operating EPR unit at design rating

It would take 4,590 MWt of heat from its reactor and reject 2,820 MWt to its cooling. Its own published net capacity is 1,630 MWe.

Derived: 1 unit × 4,590 MWt; 1 unit × 2,820 MWt. Built units may be uprated or run below rating, so these are the design’s figures scaled by the unit count, not the station’s operating data.

The whole station · Flamanville

Flamanville as one power plant.

Every unit on the site, from the atlas’s unit records: each reactor drives its own generator, which feeds the station’s switchyard and the grid. This is a schematic of how the units connect, not the station’s layout; the atlas records no buildings, cooling, switchyard arrangement or grid voltage.

Flamanville-1: PWR, operating, 1,330 MWe netFlamanville-1PWRG1,330 MWeFlamanville-2: PWR, operating, 1,330 MWe netFlamanville-2PWRG1,330 MWeFlamanville-3: EPR, operating, 1,630 MWe net, 4,590 MWt at design ratingFlamanville-3EPR4,590 MWtG1,630 MWeSwitchyardGridFlamanville-1: PWR, operating, 1,330 MWe netFlamanville-1PWR · 1,330 MWeGFlamanville-2: PWR, operating, 1,330 MWe netFlamanville-2PWR · 1,330 MWeGFlamanville-3: EPR, operating, 1,630 MWe net, 4,590 MWt at design ratingFlamanville-3EPR · 1,630 MWeGGrid
  • Operating · 3
  • On this page
Operating
3 units · 4,290 MWe netPublished net capacities, from the unit table
Heat at design rating
4,590 MWt in, 2,820 MWt rejectedDerived: 1 operating unit of a named design, each at its design’s published rating; 2 more operating units have no design figures in the library