Reactor Atlas · reference engineering

Inside a fuel channel.

Follow the boundaries, inspect the geometry and trace every dimension to its basis. This is an independently authored teaching reference, never a station’s as-built model.

Enter the visual plant walkthrough →

← Back to the plant reference

Reactor · Closed envelopes · metres, no hidden scaling. Shared plant equipment and placement are illustrative.

Horizontal calandria and channel ends between four steam generators, with separate green moderator cooling pipes. All equipment placement is illustrative.REFERENCE CONCEPT · NOT A SIMULATION

Reference still · interactive view loads when available

Representative teaching geometry, never a station’s as-built layout. Pick a component below or in 3D. Every view and selection has a shareable URL. No physics solver has run.

Fuel · Published dimension anchors

Representative fuel bundles

The full-channel detail shows 12 bundles of 37 elements. Bundle detail shows one bundle at the same scale. Rod centres, bearing pads and end-plate pattern are illustrative; pellets and detailed welds are omitted. Sheaths and end caps are represented; pellets are omitted. Ring radii, phases and hardware profiles are assumptions.

Bundles per channel
12 (documented)
Elements per bundle
37 (documented)
Bundle envelope
495.3 mm long; 102.4 mm over bearing pads (documented)
Element sheath
13.1 mm OD cold; average wall 0.4 mm (documented)
Fuel
Natural uranium dioxide (documented)
Train/span discrepancy
12 × 495.3 mm = 5.9436 m; tubesheet span is 5.94 m. Both retained. (documented)
CANDU 6 Technical Summary (May 2005), p.28

Primary heat transport · two figure-of-eight loops

  1. Fuel / pressurized D₂O in pressure tubes
  2. Outlet header
  3. Steam-generator primary U-tubes
  4. Pump and inlet header
  5. Opposite-direction core pass, second SG and pump

Warm outlets and blue returns. Each loop serves half the core. Representative feeders only.

Moderator · separate low-pressure D₂O

  1. Calandria outside calandria tubes
  2. Two moderator pumps
  3. Two moderator heat exchangers
  4. Return to calandria

Green paths. No material-flow connection to primary coolant or turbine. Service water takes heat across the exchangers and exits the model boundary.

Secondary · light water / steam

  1. Steam-generator secondary side
  2. Turbine
  3. Condenser
  4. Feedwater back to steam generators

Gold steam and blue feedwater. Shared turbine and air condensers are illustrative plant context, not reference-station equipment.

Channel boundaries · from inside to outside

  1. Fuel and primary coolant
  2. Pressure tube
  3. CO₂ gas annulus and spacers
  4. Calandria tube
  5. Cool moderator

The gas gap insulates the pressure tube. Tint, cutaways and source temperatures are explanatory cues, never computed fields.

Nominal geometry · millimetres

Read the channel section.

One bundle at its bearing-pad plane. Tube and sheath dimensions follow the cited records; element ring radii and pad contours are authored assumptions. The light interiors mark omitted pellet detail. On a narrow screen, scroll each drawing horizontally.

Nominal transverse channel section37 fuel element sheaths inside a 103.38 mm pressure-tube bore, 4.2 mm pressure-tube wall, insulating gas annulus, and 129 mm bore calandria tube with a 1.4 mm wall. Circles use the shared millimetre dimensions. The links below provide equivalent selection.Calandria tube129 mm ID · 1.4 mm wallPressure tube103.38 mm ID · 4.2 mm wallInsulating gas annulusTwo separate D₂O inventories37 element sheaths13.1 mm OD · 0.4 mm wallOver-pad bundle envelope102.4 mm diameter
Cold/unpressurized dimensions where the source specifies that condition. This section is not a tolerance drawing.
Twelve nominal 495.3 millimetre bundles total 5943.6 millimetres; the published tubesheet span is 5940 millimetres, a different datum.Displayed pressure tube · 6,100 mm assumed123456789101112Bundle stack · 5,943.6 mm nominalTubesheet span · 5,940 mm · datum difference retained
The 3.6 mm difference does not establish overlap: bundle envelopes and tubesheet faces are different reference datums.

Nominal dimension comparisons.

These are reproducible arithmetic and envelope checks, not operating clearances or acceptance limits. No thermal expansion, irradiation growth, sag, tolerance distribution or stress model has been applied.

Shared browser and CAD dimension contract
ComparisonValueBasis and limits
Elements in one bundle37 countdocumentedΣ ring counts

Topology count; ring radii/phases remain assumed.

slide 22 · source
Elements in one full channel444 countderived37 × 12

Representative complete channel count.

p.28 · source
Nominal bundle-to-tube radial difference0.49 mmderived(103.38 − 102.4) / 2

Cold nominal diameters only. No allowance for tolerances, contact, sag, irradiation or temperature; not an operating clearance.

p.28 · source
Nominal pressure-to-calandria radial gap8.61 mmmixed129 / 2 − (103.38 / 2 + 4.2)

Combines 2001 nominal wall/bore with the 2005 cold pressure-tube ID. Not a qualified interface.

slide 22 · source
Twelve-bundle envelope length5,943.6 mmderived12 × 495.3

Nominal end-to-end bundle envelope; physical end details are unresolved.

p.28 · source
Stack minus tubesheet span3.6 mmunresolved5943.6 − 5940

Different datums; this 3.6 mm difference is retained, not corrected or called interference.

p.28 · source
Derived sheath inside diameter12.3 mmderived13.1 − 2 × 0.4

Derived from average wall. It is not the fuel-pellet diameter.

p.28 · source
Minimum separation of authored element envelopes1.724 mmillustrativemin(distance between centers) − 13.1

Checks the chosen ring layout only. No hydraulic/thermal significance or design limit is assigned.

A06 · assumed geometry
Outer bare-element envelope99.7 mmillustrative2 × 43.3 + 13.1

Bearing pads extend this assumed bare-element envelope to the nominal 102.4 mm diameter.

A06 · assumed geometry

Track what crosses each boundary.

Heat transfer and material flow are different connections. The source-defined fluid inventories remain separate at these interfaces.

Editable reconstruction · channel-2

Take the engineering packet with you.

Independently authored STEP assemblies, source records, dimensions and export receipts. CAD is in millimetres with a horizontal Z axis. The full channel and one-bundle coupon are separate views of the same reference; their inventories must not be added.

STEP integrity checks establish named, valid geometry and export agreement. They do not qualify a pressure boundary, demonstrate manufacturability or validate reactor performance. Pellets, seals, spring details and qualified tolerances remain omitted.

Sources, assumptions and unresolved differences

CANDU 6, May 2005 baseline; not EC6. Metres, Y up, channel axis Z. mm × 0.001 = m. Temperatures °C; pressure basis explicit. No solver.

Assumptions and omitted detail

  • A01 · Plant / reactor. Shared building frames, turbine, air condensers and grid retain existing geometry. Calandria, shielding and equipment envelopes are illustrative, not as-built. Containment, vault water, fuelling machines, reactivity devices and safety systems are omitted.
  • A02 · Channel array. Choose 379 nearest noncentral square lattice positions plus one central detailed channel. Pitch 0.286 m and occupancy are assumed, not a loading map. Cutaway hides a sector of envelopes.
  • A03 · Representative channel. Pressure-tube wall and calandria-tube bore/wall now follow the separately identified 2001 supporting source. Pressure-tube/end-fitting lengths, end hardware, spacer positions and all tolerances remain unresolved or illustrative.
  • A04 · Paths. Topology follows pp.13–15. Routing, piping radii, representative feeders, header positions, pump shells and SG tube counts are illustrative. No velocities, thermal fields or equipment compatibility claimed.
  • A05 · Display. Warm primary outlets, blue primary returns, green moderator pipes, neutral service-water and gold secondary steam distinguish circuits. These are authored display colors, not results. Cut faces cap only the geometric shell section; cutaway is not an opening in operation.
  • A06 · Channel engineering packet. Nominal arithmetic is not a clearance acceptance criterion. Ring radii/phases, element end lengths, pad/plate profiles, spacer sections/positions and end-fitting envelopes are assumed. CAD solids omit pellets and sealing internals. Room-temperature dimensions do not predict hot, irradiated or sagged geometry.

Unresolved differences

  • C01. Rounded six-metre channel description (p.4) versus 5.94 m tubesheet span (p.28). Use 5.94 m for tubesheet span only; total pressure tube / fitting lengths assumed. These are not established as identical datums.
  • C02. 12 × 495.3 mm = 5943.6 mm, 3.6 mm longer than 5.94 m tubesheet span. Preserve both published numbers. Centre the 5.9436 m train; do not silently shorten bundles or claim a qualified axial stack.
  • C03. p.15 historical Point Lepreau gross/net 680/633 MWe versus current NB Power profile gross 715000 kW and introductory 660 MW without the same basis. No universal CANDU 6 electric output is assigned. Atlas site values remain their separately sourced data; never use this concept to revise station ratings.
  • C04. p.28 total PHTS flow 7.7 Mg/s and nominal per-channel 24 kg/s do not multiply to the same total across 380 channels. Do not derive a flow or heat balance from these labels; omit quantitative flow from the viewer. No silent reconciliation.
  • C05. PHWR family includes other CANDU designs and non-CANDU PHWRs; p.15 lists different channel counts for Bruce/Darlington. CANDU 6 is family reference only. Explicit caveat at every site; no model-name override for all PHWR units.
  • C06. AECL 2001 slide 22 rounds pressure-tube ID to 103.4 mm; the May 2005 technical summary specifies 103.38 mm cold/unpressurized. Retain 103.38 mm and record the 0.02 mm source difference; do not treat it as a tolerance.
  • C07. A broader CANDU Overview module (CANTEACH 20044210, p.2A-5) lists 6.35 m pressure-tube and 12.4 m overall lengths alongside CANDU 9 context. Applicability to this 2005 CANDU 6 channel is unconfirmed. Do not import those lengths. Keep 6.1 m pressure-tube and 8 m end-fitting envelope lengths assumed; the 5.94 m tubesheet span remains separate.