Follow the boundaries, inspect the geometry and trace every dimension to its basis. This is an independently authored teaching reference, never a station’s as-built model.
Fuel channel · Closed envelopes · metres, no hidden scaling. Surrounding plant is hidden for inspection.
REFERENCE CONCEPT · NOT A SIMULATION
Reference still · interactive view loads when available
Representative teaching geometry, never a station’s as-built layout. Pick a component below or in 3D. Every view and selection has a shareable URL. No physics solver has run.
Channel insulation · Illustrative geometry
Insulating gas annulus
The CO₂-filled annulus thermally separates the hot pressure tube from the cooler calandria tube. The translucent tint is a display cue, not a fluid calculation.
Fluid
CO₂ (p.8) (documented)
Gap size
Derived from assumed tube walls/radii (illustrative)
Primary heat transport · two figure-of-eight loops
Fuel / pressurized D₂O in pressure tubes
Outlet header
Steam-generator primary U-tubes
Pump and inlet header
Opposite-direction core pass, second SG and pump
Warm outlets and blue returns. Each loop serves half the core. Representative feeders only.
Moderator · separate low-pressure D₂O
Calandria outside calandria tubes
Two moderator pumps
Two moderator heat exchangers
Return to calandria
Green paths. No material-flow connection to primary coolant or turbine. Service water takes heat across the exchangers and exits the model boundary.
Secondary · light water / steam
Steam-generator secondary side
Turbine
Condenser
Feedwater back to steam generators
Gold steam and blue feedwater. Shared turbine and air condensers are illustrative plant context, not reference-station equipment.
Channel boundaries · from inside to outside
Fuel and primary coolant
Pressure tube
CO₂ gas annulus and spacers
Calandria tube
Cool moderator
The gas gap insulates the pressure tube. Tint, cutaways and source temperatures are explanatory cues, never computed fields.
Nominal geometry · millimetres
Read the channel section.
One bundle at its bearing-pad plane. Tube and sheath dimensions follow the cited records; element ring radii and pad contours are authored assumptions. The light interiors mark omitted pellet detail. On a narrow screen, scroll each drawing horizontally.
Cold/unpressurized dimensions where the source specifies that condition. This section is not a tolerance drawing.The 3.6 mm difference does not establish overlap: bundle envelopes and tubesheet faces are different reference datums.
Nominal dimension comparisons.
These are reproducible arithmetic and envelope checks, not operating clearances or acceptance limits. No thermal expansion, irradiation growth, sag, tolerance distribution or stress model has been applied.
Independently authored STEP assemblies, source records, dimensions and export receipts. CAD is in millimetres with a horizontal Z axis. The full channel and one-bundle coupon are separate views of the same reference; their inventories must not be added.
STEP integrity checks establish named, valid geometry and export agreement. They do not qualify a pressure boundary, demonstrate manufacturability or validate reactor performance. Pellets, seals, spring details and qualified tolerances remain omitted.
Slides 1, 3–4 and 22; slide 22 visually inspected. Supporting channel dimensions and circuit topology only; no safety-performance claims imported.
Assumptions and omitted detail
A01 · Plant / reactor. Shared building frames, turbine, air condensers and grid retain existing geometry. Calandria, shielding and equipment envelopes are illustrative, not as-built. Containment, vault water, fuelling machines, reactivity devices and safety systems are omitted.
A02 · Channel array. Choose 379 nearest noncentral square lattice positions plus one central detailed channel. Pitch 0.286 m and occupancy are assumed, not a loading map. Cutaway hides a sector of envelopes.
A03 · Representative channel. Pressure-tube wall and calandria-tube bore/wall now follow the separately identified 2001 supporting source. Pressure-tube/end-fitting lengths, end hardware, spacer positions and all tolerances remain unresolved or illustrative.
A04 · Paths. Topology follows pp.13–15. Routing, piping radii, representative feeders, header positions, pump shells and SG tube counts are illustrative. No velocities, thermal fields or equipment compatibility claimed.
A05 · Display. Warm primary outlets, blue primary returns, green moderator pipes, neutral service-water and gold secondary steam distinguish circuits. These are authored display colors, not results. Cut faces cap only the geometric shell section; cutaway is not an opening in operation.
A06 · Channel engineering packet. Nominal arithmetic is not a clearance acceptance criterion. Ring radii/phases, element end lengths, pad/plate profiles, spacer sections/positions and end-fitting envelopes are assumed. CAD solids omit pellets and sealing internals. Room-temperature dimensions do not predict hot, irradiated or sagged geometry.
Unresolved differences
C01. Rounded six-metre channel description (p.4) versus 5.94 m tubesheet span (p.28). Use 5.94 m for tubesheet span only; total pressure tube / fitting lengths assumed. These are not established as identical datums.
C02. 12 × 495.3 mm = 5943.6 mm, 3.6 mm longer than 5.94 m tubesheet span. Preserve both published numbers. Centre the 5.9436 m train; do not silently shorten bundles or claim a qualified axial stack.
C03. p.15 historical Point Lepreau gross/net 680/633 MWe versus current NB Power profile gross 715000 kW and introductory 660 MW without the same basis. No universal CANDU 6 electric output is assigned. Atlas site values remain their separately sourced data; never use this concept to revise station ratings.
C04. p.28 total PHTS flow 7.7 Mg/s and nominal per-channel 24 kg/s do not multiply to the same total across 380 channels. Do not derive a flow or heat balance from these labels; omit quantitative flow from the viewer. No silent reconciliation.
C05. PHWR family includes other CANDU designs and non-CANDU PHWRs; p.15 lists different channel counts for Bruce/Darlington. CANDU 6 is family reference only. Explicit caveat at every site; no model-name override for all PHWR units.
C06. AECL 2001 slide 22 rounds pressure-tube ID to 103.4 mm; the May 2005 technical summary specifies 103.38 mm cold/unpressurized. Retain 103.38 mm and record the 0.02 mm source difference; do not treat it as a tolerance.
C07. A broader CANDU Overview module (CANTEACH 20044210, p.2A-5) lists 6.35 m pressure-tube and 12.4 m overall lengths alongside CANDU 9 context. Applicability to this 2005 CANDU 6 channel is unconfirmed. Do not import those lengths. Keep 6.1 m pressure-tube and 8 m end-fitting envelope lengths assumed; the 5.94 m tubesheet span remains separate.